Site Engineering Team
Tuesday, August 26, 2008
The site engineering contract has been
signed and the design team is hard at work to get everything prepared for submission to
all of the governing agencies. This design will include the layout of the building on the
grounds, handling of storm water as required, parking lots, driveways, sidewalks, well
and septic, and a flurry of other things that are required to make sure that the site is
ideally prepared for the building construction. This is the longest phase of the project
and so getting a jump on this early is very beneficial to the team.